Granny Flat Approvals
With Vivo

Expert Guidance for a Stressless and Seamless Process

  • Complying Development experts.

  • Speedy Granny Flat approval process.

  • Preparation of supporting documents.

  • Backed by hundreds of successful approvals.

  • Avoid the disappointment of no council approval for your Granny Flat.

A clear and safe pedestrian pathway leads directly to the entrance of a contemporary secondary dwelling, satisfying the access requirements for Granny Flat Approvals NSW.

Approval
for Your
Granny Flat
How It Works

Avoid the Stress and Welcome Rapid
Approval for Your Granny Flat

Background to Granny Flat Approvals

In 2009, the State Government introduced the ‘State Environmental Planning Policy for Affordable Rental Housing’, otherwise known as (AHSEPP) 2009. This is State Government legislation.

When a property and the proposed Granny Flat structure comply with this legislation, approval can be carried out via Complying Development. This means that a ‘Private Certifier’ or ‘Council’ can approve the project. This is a fast approval, which can be completed in around 20 days.

The great news is that the council DA process is bypassed to achieve approval in a relatively short period.

Advantages of Vivo for Approval for
Your Granny Flat

We are Complying Development experts and can efficiently manage your project in the shortest space of time.

We will prepare your project by organising your Architectural, Engineering, Stormwater, Basix, and Water Authority approval. These documents will be prepared according to legislation compliance before being submitted to our Private Certifier.

This is a very exciting process, providing the opportunity for homeowners and developers to save time and money in an otherwise lengthy and gruelling procedure through the council.

A Development Application will be submitted to the council if the project does not meet State Government legislation requirements.

Minimum Requirements for CDC
Granny Flat Approvals

BLOCK
SIZE
MINIMUM SETBACK FROM
Frontage Site Coverage Total Floor Area Landscape Area Front Boundary Side Boundary Rear Boundary
450-600m2 12m 50% 330m2 20% 4.5m 0.9m 3m
600-900m2 12m 50% 380m2 25% 4.5m 0.9m 3m
900-1500m2 15m 40% 430m2 35% 6.5m 1.5m 5m
1500m2+ 18m 30% 430m2 45% 10m 2.5m 10m

Typical Site Plan

Lot size 450-900m2

Trees

Setbacks from ‘protected’ trees must be at least 3m. If tree removal is necessary, a separate tree removal permit may be required. Please check with your local council.

Private Open Space

24m2 of private open space must be provided. It must be at least 4m wide and directly accessible from and adjacent to a habitable room other than a bedroom.

Size & Height

  • A Granny Flat may not be larger than 60m2 measured from external walls.
  • It can be 1, 2 or 3 bedrooms.
  • The maximum height is 8.5m, however all setback distances may be further with increased Granny Flat height. A formula is used when the height exceeds 3.8m at setback points.

Stormwater

Site drainage must comply with your council’s stormwater policies.

A detailed site plan diagram illustrates the optimal placement of a 60m² secondary dwelling, highlighting the necessary boundary setbacks for Council Approval Granny Flat.

Is Your Block Granny
Flat Compliant?

or Complete the Form Below

Be Sure to Leave Your Address So We Can
Complete a Online Property Assessment for You

Granny Flat Approval FAQs

What Is the Granny Flat Approval Cost?

The price of Granny Flat approval in Sydney varies depending on several factors:

  • Project complexity.
  • Engineering requirements.
  • Plans to amend your main property.
  • Council contribution fees – area dependent.
  • Council-imposed property conditions which may require additional consultants.
  • Council fees — such as bonds, road opening permits, standing plant permits, etc.
  • Other considerations — e.g. land inclines, easements, and tree removal.

Vivo Granny Flats will discuss your specific project and provide accurate and transparent costings for approval.

Do You Need Approval for Granny Flat NSW?

Approval is always required, however, in Sydney, homeowners can bypass councils’ development application process. Under the 2009 State Environmental Planning Policy for Affordable Rental Housing legislation, you can enjoy speedy approval for your project — usually in about 20 days via the Complying Development process.

Where in Sydney Do You Assist With the Granny Flat Approval Process?

Although we provide meticulous Granny Flat approval services
Sydney-wide, projects are particularly popular in the Hills District, the North Shore, and the Northern Beaches

What Are the Minimum Size Requirements for My Granny Flat?

For approval, your Granny Flat should meet the following requirements:
  • Your total property size needs to be at least 12m wide and 450m2.
  • Your property must be zoned R1, R2 or R3 for residential use, not commercial.
  • A minimum of 3m from the back of your property and the Granny Flat.
  • A minimum of 0.9m from the side property boundary.
  • Only one Granny Flat is permitted on an eligible property.

Have More Questions on Granny Flat Approvals?​