Granny Flats Process

Knowing where to start your Granny Flat journey can be confusing and intimidating. Vivo Granny Flats guides you from your very first step — from site visits and assessment to approval and construction.

Getting Started 1

Granny Flat Assessment

Planning certificate lies atop a detailed cost breakdown, ensuring every granny flat quote is based on accurate site-specific data.

Does your property meet the minimum requirements for Granny Flat development? We can easily answer that question by performing a desktop assessment.

We will check your lot size, width, setbacks, and surrounding environment (laneways, reserves, etc.).

If you have access to the following documents, we can investigate further to confirm compliance and to determine whether there are any land issues that may add costs to the project.

  • 10.7 Certificate.
  • Title search.
  • Sewer diagram.

Jump over to our Approvals page to learn more about how Granny Flats are approved and get your FREE desktop assessment.

Planning certificate lies atop a detailed cost breakdown, ensuring every granny flat quote is based on accurate site-specific data.
Getting Started 2
A professional building inspector meticulously examines the interior of a secondary dwelling while recording detailed notes, showcasing the quality assurance behind Granny Flat Solutions.

Granny Flat - Site Visit

Our building & compliance inspector will visit your site to check and record the following information:

  • Access to the proposed building area.
  • Slope of your property — is it higher or lower than the street?
  • Stormwater, Electricity, Water, & Gas connection points.
  • Trees within the proposed Granny Flat location.
  • Positioning of the Granny Flat.
  • Any demolition or works done by the owner prior to construction.

A site visit takes approx 20 minutes.

A professional building inspector meticulously examines the interior of a secondary dwelling while recording detailed notes, showcasing the quality assurance behind Granny Flat Solutions.
Getting Started 3
A modern secondary dwelling is positioned perfectly to overlook a small, neatly landscaped side yard, highlighting how granny flat prices include clever site integration.

Granny Flat Quote

A detailed Granny Flat quote will be prepared and delivered to you.

The quote will cover the following:

  • The best shape and location for your Granny Flat.
  • How and where the services will be connected (sewer, water, stormwater, data & electricity).
  • Full list of inclusions.
  • Optional upgrades if required.
  • If you’re happy to move forward at this point, we will ask you for your acceptance, and the Design & Granny Flat Approvals process will begin.
  • You can expect your quote to take 3-5 business days to complete.
A modern secondary dwelling is positioned perfectly to overlook a small, neatly landscaped side yard, highlighting how granny flat prices include clever site integration.
Getting Started 4
A professional hand points to a specific clause on a set of architectural plans and permit forms required for Council Approval for Granny Flat.

Granny Flat Design & Approval

The Granny Flat Designs & Approval stage is where all the project planning is completed. Here’s what you can expect:

  • A survey of your land will be ordered.
  • A preliminary concept site and Granny Flat floor plan will be provided for your review.
  • We will complete a material and colour selection session together.
  • Full architectural plans will be drawn upon concept sign-off.
  • Water authority approval completed.
  • Structural and Stormwater engineers engaged.
  • Application and preparation of documentation for submission to Private Certifier.
  • Building Contract prepared and signed.
  • Project prepared and handed to the construction team.

This stage takes approximately 6-8 weeks to complete.

A professional hand points to a specific clause on a set of architectural plans and permit forms required for Council Approval for Granny Flat.
Getting Started 5
Getting Started Arrow
A skilled tradesperson precisely fix timber lining of a exterior eave of a secondary dwelling, demonstrating the high-quality craftsmanship of Granny Flat Builders NSW.

Granny Flat Construction

We will introduce you to our Construction Manager, who will handle your project for the duration of construction.

Since we are systemised and organised, you can expect completion of your Granny Flat in approximately 16 weeks.

Once complete, we will prepare for handover!

A skilled tradesperson precisely fix timber lining of a exterior eave of a secondary dwelling, demonstrating the high-quality craftsmanship of Granny Flat Builders NSW.
Getting Started 6
A close-up shot shows a hand holding the silver key to a newly completed secondary dwelling, symbolising the final handover of Granny Flats NSW.

Your Granny Flat Handover!

On completion, our Private Certifier will perform a final site visit.

Once they’re satisfied that the building is suitable for occupation (as required by the Building Code of Australia and Complying Development (or DA) approval), the Certifier will arrange your Occupation Certificate approval. An Occupation Certificate will be produced, given to you and registered with your local council.

Now it’s your turn to enjoy the many benefits of owning a Granny Flat for years to come!

  • Stylish and modern Granny Flat designs.
  • Energy-efficient.
  • Completed projects across Sydney.
  • Exceptional finishes.
  • Prompt, on-schedule Grannyflats completion.
A close-up shot shows a hand holding the silver key to a newly completed secondary dwelling, symbolising the final handover of Granny Flats NSW.

Getting Started With Granny Flats FAQs

How Do I Know if My Property Is Suitable for a Granny Flat?

Either call us to discuss your site or fill out the contact form — ensure you give us your address! We will rapidly search for your property and create a speedy desktop assessment. This will only take around ten minutes!

Is It Essential for Me To Be at Home While You Complete a Site Inspection?

Not at all! A Granny Flat site inspection only takes around 20 minutes. All we need is access to the sides, backyard, and front of your home. We don’t need to go inside your premises!

If My Property Isn't Suitable for a Granny Flat, Is There Anything I Can Do?

Yes! If our assessment indicates that your property isn’t suitable — and therefore ineligible for a Complying Development Approval Certificate — we can instead pursue development through a traditional DA process.

In Later Years, May I Subdivide My Granny Flat and Sell It?

Unfortunately not! Your Granny Flat, under the development approval process, has to remain a single title. You cannot break it down into separate properties and sell them as individual units.

Have More Questions on Getting Started With a Granny Flat

Now It’s Your Turn to Enjoy the Many Benefits Of
Owning a Granny Flat for Years to Come!

Get Started Today

Talk to Vivo and Discover the Granny
Flat Cost, Revenues, and Investment Opportunities!

Looking for
the Perfect Investment?

Granny Flats deliver a remarkable return on investment for both property entrepreneurs and homeowners!

A compact and modern culinary space featuring clever storage solutions and a streamlined layout, showcasing innovative granny flat kitchen ideas.